Weymouth, Massachusetts
A LEED-certified 22,000 square foot animal hospital and education center is sited on 13 acres in Weymouth, providing care for sick, injured and orphaned native animals. The state-of-the-art facility is a resource for elementary through higher education students, professionals and the public, and nurtures understanding of the interaction between mankind, wildlife and the environment. A compact footprint minimized site disturbance; three levels are connected by a naturally lit atrium that enhances communication between teaching, administrative, treatment, ward and general public areas. The site and building were designed to be sustainable, utilizing recycled, renewable and easily maintained materials. Sophisticated controls allow natural light to be utilized whenever available, and photovoltaic roof shingles produce electricity.
Strekalovsky Architecture has built a reputation for creativity, knowledge of construction, permitting skills and cost control for a wide variety of public and private clients for over 40 years. Projects include multi and single family housing, mixed use, commercial, civic, religious, medical, veterinary, educational, corporate, recreational, and “house doctor” services for a variety of town, county and State entities. We have received several awards from the Boston Society of Architects and are noted for buildings that fit well into their environment.
Our clients are as varied as they are demanding; Here are some of our abilities:
• Site Design
• Master Planning
• Consulting Engineering
• Life Safety Code Analysis
• Neighborhood Integration
• Community Design Sessions
• Grant Application Assistance
• Historic Preservation
• Sustainable Design Solutions
• Goals and Visioning Sessions
• Master Planning
• Program Analysis and Development
• Site Evaluation and Selection
• Project Budget Determination
• Physical Conditions Assessment
• Long Term Scheduling
• Permitting and Regulatory Approvals
• Community Forums
• Program Management
• Design-Build Partnering
• Contract Administration
• Construction Management
• Cost Estimate Development
• Value Engineering Sessions
• Bid Documents Review
• Facilities Budget Assessment
A curation of our extensive works.
Our Customers Love Us and We Love Them!
Some of our accolades through the years;
Oxford High School, Oxford, MA
95 Tremont Street, Duxbury, MA, Medical Office Building
Whiting Lane Condominiums, Hingham, MA
Medfield Town Hall, Medfield, MA
Symphony Road Townhouses, Boston, MA
Harwich Community Center, Harwich, MA
Gloucester Mill Housing, Gloucester, MA
Keystone Apartments, Boston, MA
Private Residence, Cohasset, MA
Clubhouse for Klondike Campground, Otis, MA
Keystone Apartments, Boston, MA
Private Residence, Osterville, MA
Our Core Group of Architects and Managers
Hours: Monday through Friday 9am to 5pm EST
Please send your message below. We will get back to you at the earliest!