Bourne, Massachusetts
The intent was that the specialized veterinary facility feel comforting and inviting, recalling Cape Cod beach pavilions. Patients entering and exiting are separated, and the geometry of the bright, flowing space of the lobby allows further segregation. The 10,000 square foot single-story building is naturally lit, designed to today’s high hospital standards, and includes ten examination rooms, a doctor’s suite, surgery and intensive care suites, x-ray and MRI facilities, canine and feline wards, and a pharmacy.
Strekalovsky Architecture has built a reputation for creativity, knowledge of construction, permitting skills and cost control for a wide variety of public and private clients for over 40 years. Projects include multi and single family housing, mixed use, commercial, civic, religious, medical, veterinary, educational, corporate, recreational, and “house doctor” services for a variety of town, county and State entities. We have received several awards from the Boston Society of Architects and are noted for buildings that fit well into their environment.
Our clients are as varied as they are demanding; Here are some of our abilities:
• Site Design
• Master Planning
• Consulting Engineering
• Life Safety Code Analysis
• Neighborhood Integration
• Community Design Sessions
• Grant Application Assistance
• Historic Preservation
• Sustainable Design Solutions
• Goals and Visioning Sessions
• Master Planning
• Program Analysis and Development
• Site Evaluation and Selection
• Project Budget Determination
• Physical Conditions Assessment
• Long Term Scheduling
• Permitting and Regulatory Approvals
• Community Forums
• Program Management
• Design-Build Partnering
• Contract Administration
• Construction Management
• Cost Estimate Development
• Value Engineering Sessions
• Bid Documents Review
• Facilities Budget Assessment
A curation of our extensive works.
Our Customers Love Us and We Love Them!
Some of our accolades through the years;
Oxford High School, Oxford, MA
95 Tremont Street, Duxbury, MA, Medical Office Building
Whiting Lane Condominiums, Hingham, MA
Medfield Town Hall, Medfield, MA
Symphony Road Townhouses, Boston, MA
Harwich Community Center, Harwich, MA
Gloucester Mill Housing, Gloucester, MA
Keystone Apartments, Boston, MA
Private Residence, Cohasset, MA
Clubhouse for Klondike Campground, Otis, MA
Keystone Apartments, Boston, MA
Private Residence, Osterville, MA
Our Core Group of Architects and Managers
Hours: Monday through Friday 9am to 5pm EST
Please send your message below. We will get back to you at the earliest!